{"id":1887,"date":"2026-02-03T14:33:46","date_gmt":"2026-02-03T14:33:46","guid":{"rendered":"https:\/\/gpocoind.com.mx\/?p=1887"},"modified":"2026-02-03T14:33:48","modified_gmt":"2026-02-03T14:33:48","slug":"fabricacion-y-montaje","status":"publish","type":"post","link":"https:\/\/gpocoind.com.mx\/en\/2026\/02\/03\/fabricacion-y-montaje\/","title":{"rendered":"MANUFACTURING AND ASSEMBLY"},"content":{"rendered":"<p>ENGINEERING THAT RISES ABOVE THE CHALLENGE<\/p>\n\n\n\n<p>At GCI, complex projects are where our capabilities truly stand out. One of the most significant milestones in our history was the supply, fabrication and erection of the Elevated Flare \u2013 Derrick Tower, a project that demanded absolute precision, advanced engineering and flawless execution at height.<\/p>\n\n\n\n<p>Developed for ICA Fluor, this project represents a landmark achievement for the energy and industrial sector in Latin America.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-1024x576.jpg\" alt=\"\" class=\"wp-image-1888\" srcset=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-1024x576.jpg 1024w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-300x169.jpg 300w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-768x432.jpg 768w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-1536x864.jpg 1536w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-2048x1152.jpg 2048w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-DJI_0370-18x10.jpg 18w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>A LANDMARK PROJECT AT GLOBAL SCALE<\/strong><\/h2>\n\n\n\n<p>Executed in a 4-month period, the project involved the complete fabrication and assembly of a high-performance steel structure, culminating in the installation of the tallest Derrick Tower in Latin America and the fourth tallest worldwide, as recognized by Zeeco Therme technologists.<\/p>\n\n\n\n<p>Key figures that define the challenge:<\/p>\n\n\n\n<p>200 meters high, assembled in 20 modules<\/p>\n\n\n\n<p>2,972 tons of steel structure<\/p>\n\n\n\n<p>124,987 man-hours executed under strict safety and quality standards<\/p>\n\n\n\n<p>Each stage of the project reflects GCI\u2019s ability to manage large-scale infrastructure with precision, efficiency and total operational control.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"1889\" src=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-1024x576.jpg\" alt=\"\" class=\"wp-image-1889\" srcset=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-1024x576.jpg 1024w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-300x169.jpg 300w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-768x432.jpg 768w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-1536x864.jpg 1536w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-2048x1152.jpg 2048w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0612-18x10.jpg 18w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"1890\" src=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-1024x576.jpg\" alt=\"\" class=\"wp-image-1890\" srcset=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-1024x576.jpg 1024w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-300x169.jpg 300w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-768x432.jpg 768w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-1536x864.jpg 1536w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-2048x1152.jpg 2048w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/DJI_0652-18x10.jpg 18w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>INDUSTRIAL CAPABILITIES YOU CAN TRUST<\/strong><\/h2>\n\n\n\n<p>From steel fabrication to final erection, every process was executed with a strong focus on safety, quality assurance and schedule compliance. This achievement highlights the strength of our technical teams, our certified processes and our experience delivering critical infrastructure for the energy industry.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"683\" height=\"1024\" src=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-683x1024.jpg\" alt=\"\" class=\"wp-image-1891\" srcset=\"https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-683x1024.jpg 683w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-200x300.jpg 200w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-768x1152.jpg 768w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-1024x1536.jpg 1024w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-1365x2048.jpg 1365w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-8x12.jpg 8w, https:\/\/gpocoind.com.mx\/wp-content\/uploads\/2026\/02\/Copia-de-Derrick-noche-scaled.jpg 1707w\" sizes=\"auto, (max-width: 683px) 100vw, 683px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">BUILDING THE FUTURE OF ENERGY INFRASTRUCTURE<br><\/h2>\n\n\n\n<p>At GCI, we don\u2019t just build structures \u2014 we deliver confidence, performance and long-term value. Projects like this position us as a reliable partner for international clients seeking world-class fabrication and erection capabilities.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>                           If you would like to learn more about our projects or collaborate with us:<\/strong><\/td><\/tr><tr><td><\/td><\/tr><tr><td>                                         <strong>Desarrollo de Negocios \/ Business Development<\/strong><\/td><\/tr><tr><td><strong>Tel.<\/strong>\u00a0<a href=\"tel:527731006100\">+52 773 100 61 00<\/a>.                                                                                      <strong>Web.<\/strong>\u00a0<a href=\"https:\/\/sender3.zohoinsights-crm.com\/ck1\/2d6f.327230a\/a35d2050-fd6c-11f0-bfe0-1ae16fad91d9\/292b864a2a8c9149d29f29158e1243ec124116b8\/2?e=OzplVx7qYJy0NFfY3gs%2FUvg3mwRzV%2FLSOyuJPg6PEb0%3D\">gpocoind.com.mx<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>                                      <strong>GRUPO CONSTRUCTOR INDUSTRIAL OIL &amp; GAS<\/strong><\/td><\/tr><tr><td><strong>            Address:<\/strong>\u00a0Lot 3, Block 2, Atitalaquia Industrial Park, Hidalgo, ZIP Code 42970\u00a0<\/td><\/tr><tr><td>                             <em>Energy, infrastructure, and commitment that build the country.<\/em><\/td><\/tr><\/tbody><\/table><\/figure>","protected":false},"excerpt":{"rendered":"<p>INGENIER\u00cdA QUE SUPERA EL RETO En GCI, los proyectos complejos son aquellos en los que nuestras capacidades realmente se destacan. Uno de los hitos m\u00e1s importantes de nuestra historia fue&#8230;<\/p>","protected":false},"author":5,"featured_media":1892,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":{"0":"post-1887","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-news-letter"},"_links":{"self":[{"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/posts\/1887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/comments?post=1887"}],"version-history":[{"count":1,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/posts\/1887\/revisions"}],"predecessor-version":[{"id":1893,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/posts\/1887\/revisions\/1893"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/media\/1892"}],"wp:attachment":[{"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/media?parent=1887"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/categories?post=1887"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gpocoind.com.mx\/en\/wp-json\/wp\/v2\/tags?post=1887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}